Box 15, Folder 4, Document 93

Dublin Core

Text Item Type Metadata

Text

LAND USE

GRANT PARK

The Sydney-Glenwood one-way pair poses land use problems for the north end
of Grant Park. It will be difficult to maintain the area between the one-way pairs as
desirable residential and pressure will be strong to turn the narrow strip between Glenwood
and the Freeway into commercial. All these factors will be detrimental to the neighborhood.
Careful study should be given to extending Fulton Street from Connally as a four-lane two-
way collector immediately adiacent to the Freeway and connecting to Glenwood with a grade

separation at Boulevard.


public items show