Dublin Core
Text Item Type Metadata
Text
fpr eS I PT AE SECT AS ETRE PCT
+t Bk et re ed ald hee ne a ht iat aks i al ee Sl lS
SN ee ee i ih ee se ee
pe arn na
Pat A eae .
SITE DESIGN PLANS
The site design plans for Daniel Stanton Park and Harper Park are
attached in this code and illustrate proposed development in
successive stages. ‘The City of Atlanta clearly desires to develop
completely these parks now, but the lack of funds prohibits this «il
accomplishment. This application concerns only the first phase |
development of Harper Park and the second and third phases of
development of Daniel Stanton Park. The first phase development
of Daniel Stanton Park was accomplished without Federal assistance,
These stages of development for each of these parks are more fully |
described on the following pages.
Code OS J41
oot
DANIEL STANTON PARK MASTER PLAN
First Phase Development:
The first phase of development includes the hauling-
.in of a large quantity of earth to cover the site
which at one time was a landfill area. In addition
sufficient grading was done to provide vehicular
access, useable level areas, and a workable drainage
network,
Specific Items Include:
a. Storm Drainage System
b. Drive and Parking
ce. Softball Diamond
d. Pre-school Childrens Play Area With Spray
Pool
Second Phase Development:
a. Pedestrian Circulation
b. Multi-use Court Area
ce. Sitting - Outdoor Meeting Area, Adjacent to
Pre-school Play Area
d. Climbing Play Apparatus
e. Grassing ‘
Third Phase Development:
a. Bicycle Track
b, Maintenance Storage Building
c, Additional Pedestrian Walks
Enclosing Play Apparatus Area With Curbing
and Filling with Sand ’
Complete Landscaping to Include Trees and
Shrubs
Lighting of Parking Lot, Pedestrian Walks,
Softball Field and Multi-use Courts
Code OS 141
HARPER PARK MASTER PLAN
First Phase Development:
The first phase of development will include all the site
preparation necessary to make the area usable. Because
of the rough terrain, grading will make up a large portion
of the site preparation.
Specific Items Include:
a. Storm Drainage System
b. Drive and Parking
c. Battery of Paved Basketball Courts
d. Fencing
e. Walkways
Second Phase Development:
a. Tennis Courts
b. Childrens Play Areas
ce. Sentor Citizens Game Area
d. Picnic Areas With Pavilions
e. Additional Walks
£. General Park Lighting
Third Phase Development:
a. Recreation Building
b. Maintenance Storage Building
ce. Complete Landscaping
Code OS 141