.NDcxNQ.NDcxNQ

From Scripto
Jump to: navigation, search

C I TY OF A TLANTA DEPARTMENT of CONSTRUCTION 301 CITY HALL Atlanta 3, Georgia July 19, 1967 RICHARD W. RESPESS ASST. CHIEF OF CONSTRUCTION RAY A . NIXON Chief of Construction ROBERT H. MORRISS MEMO TO: Ray A. Nixon - Director of Public Works FROM: Ken Lancaster ASST, CHIEF OF CONSTRUCTION As directed, an investigation was made at #555 East Anthony Street N. W. to determine if we could be of assistance in the solution of a flood problem. We found that storm water from the streets does not flow into this drain ditch, and, therefore, responsibility by this Department cannot be justified. However, there is a great volume of storm water flowing into this ditch from City property belonging to the Parks Departmens. I believe, it would relieve the problem of this ditch -overflowing onto this person's property if this water was intercepted and directed to Proctor Creek. · This could be accomplished by constructing a bunker at the top of the small ditch bank or by the grading of a small berm ditch parallel to the existing one. RKL/pae ATLANTA TUE DOGWOOD CITY �