Box 13, Folder 12, Document 40

Dublin Core

Text Item Type Metadata

Text







OD . dog a ¢ Aa)
ioe (gu3y) : ‘ (sugz)
*. ‘-

THOMASVILLE PARK , i aoe



BIDS SUBMITTED TO INCLUDE (Break bids down as listed below) .



ror 2.

be

Cost for ail Incidental Work (AL1 labor, materials,
and ceulpment necessary to complete all miscel~
Laneous incidental items of work required by or
inferred from plans and specifications. Generally
includes incidental Gun EEBUGEIGn work, services,
concds, permits, etc,., which cannot be allocated
properly to other sections of specifications

Total Cost $ 800.00

Cost fox Clearing, Grubbing and ppv”

‘Demolition Arrrox. 3.5 Acres c Total Cost $§_ /4 40. 0O

Unit. Faiee ONC Scr
Cost for Grading Includes Sabcut)

(2) Approximately 5,700 cu. yds.

nate and fill

Unit Price _@. 0.55 /eu. “yd Total Cost $___.3./35.00

(b) ‘Rock (1£ encountered)! Jus a
‘Unit Price _/o** /eu.: yd. t Se ie

Cost for Storm Drainage ©”



(a) 3 Catch Basins’: ~ ok é;
fo perce 22. pO: vert, ff. -._*" ae
Unit Price 40~ /vert. ft. Fotaly Cost pits ti 350.00
(b) Sppeoninately 338 lin, £6. 15" ns Aen © -
concrete pipe ae
Unit Price @@ /lin, ft. Total Cost $ 2.028, 00
(c) Concrete Headwall (1) / - ‘Total Cost $_ 130.00
(a) Trench Rock (if Sancineased) “4
Unit Price 37,00/ cu. yd. Total Cost $
{e) Approximately 204 lin; fe. a" SR a :

perforated bell & spigot
drain tile

Unit Price 2.50 /lin. ft. Total Cost $ 3/0 00
Cost for Masonry Work
(2) Approximately 43 Perch

Masonry Walls

Unit Price 27 5fifPexch ' Total Cost $ //8 2.50

(b) Approximately 7 cu. yds.
conerete footing

Unit Price _33.70/ cu. yd... Total Cost $ A le QO |
PROPOSAL 4.


-_

luo
\ourx|

LO2OSAL fCent'd)

{ CONSTRUCTION = THOMASVILLE PARK



BIDS SUBMITTED TO INCLUDE (Break bids down as listed below)

Cost for Masonry Work (continued)

.pproximately 1,520 sq. £t. ;
granite rip-rap. / pe
Unit Price _/, #0 /ous=yd. Cost $ 2,/23.00

me
t for Concrete Work

Approximately 2.000 lin, ft.
curb‘ and gutter

Unit Price 2 PS fis. £05. * 4 Total Cost $ 2450. OO

Avproximatel Lins fe.

See tot et aen ees around |
Game Courts : i ayeeel

Unit Price 2/5 LIS Misi Efi Cost $ 1560.90

Approximately 2, 2,565: ‘sq. ft. :
comb, walk and curb’. Ls:

Unit Price _0.68% /sq. ft. ~' Total Cost $ 7.20
Approximately 9.288 sq. ft, plain : !
walk

Unit Price O48 /sq. fe. . Total Cost $ 58.2

Approximately 286 lin, ft. steps “°": ce
Unit Price _ 4, 70/lin. ft. eaten: Cost $. /7/6.0C0

Approximately 54 lin. ‘fe,
reinforced conerete wall .

Unit Price 6&7 75 /1in. ft, .. Total Cost § 3 7/2250

4, Concrete Apron
(City of Atlanta) Total Cost $ G5O,00

for Fencing

Approximately 717 a ‘ ft.
10’ fence Ce ‘gang

= ee
Unit Price _3.9/ /lin. ft. «Total Cost.$_ 2803.47

(b) 3 Steel Fabric Gates ‘=
3° 7' Pad Lockable |

Unit Price’ 45 77 Neate ‘Total Cost $ J3 5,00

(c) 123 lin, ft. 2-member
galvanized steel hand rail
Unit Price 720 /lin. ft. t Total Cost $_ 8 G/.00

tot gh el Oe
(d) 2 Service Gates -I/*6'x 10-0" ( Total Cost 4: fe. CO
nit Pree L200 Gate PROPOSAL






/
Mek at bf

ous}



CONSTRUCT

TON » THOMASVELLE PARK

| AuOu;
(ousx:

BIDS SUBMITTED TO TNCLUDE (Break bids down as Listed

. Cost for Aspha2t Paving

(a) Avoproximately 2,110 sq. yds. ..

Drive and Perkirg
Unit Price 2,.20_/sq. yd.

(b) Approximately 1,740 sq. yds.

Tennis & EST UR Courts Paving

Unit Price 2.70 _/sq. yd.

(c) Painting Lines (Parking,
Tennis & Multi-use Courts)

(d) 4 Tennis

Unit Price 26 00/post
(e) Asphalt Swale at Lower end
of Tennis Courts idl
9, Prefabricated Steel Building caudate
Conerete Floor Slab for. Steel

Building - Approximately 96
sq. “EE. ~ Conerete Floor Slab
_Unit Price //7_/sq. ft.

| 10. Sprigging Area
A,

Approximately 106 200 Se ft,
Sprigging
Unit Price _0.07/sq.° ft.

-: 11. Topsoil

Appr roximately —300— 500. one yd.
@ # F-O cu. cu. yd oe A

LUMP SUM FOR JOB COMPLETE

1 bt
to 50% of the total
tT

C
oO
i
rt
+O
"
oe

Total Cost as

Total ‘Cost °$

Net Posts. (Tennis Courts)

Total Cost $

Total Cost $

ae
aoe, “US

~ Potal Cost $

below)

4642, 01 00°

Total Cost $ 4628.00
330,00
/4.0.00
72.00

“Total Cost $ 1072.50 :

Total, Cost $ JO5..60

ZFB

Total Cost C2 FLO. OO

$ “54, 2GL. D>


a
ee te Tee aa

a ineraaeed or decreased up
aggregate bid without entitling the Contrac-.
claim for extra pay because of any damage he may

. Sustain on account of such increase or decrease and such addi- ©

tion ox deduction may be made to only one item or may be

Jon at
Gistributed over the entire bid,

PROPOSAL 6.

And)
Oulx |




public items show